Approach fill for the Route 625 Bridge over Route 28, East
of Route 28.
|
Eastbound Broad Run Bridge is now complete. Approach roadway
is currently under construction for the future widening of
Route 625 West of Route 28.
|
Future Eastbound Route 625 approach to the bridge over Route
28, passing under the flyover bridge.
|
Future Westbound Route 625 from the bridge over Route 28,
passing under the flyover bridge.
|
Ramp moving traffic from Eastbound Route 625 to Southbound
Route 28 open to traffic in the background. The foreground
shows Old Route 625.
|
Ramp moving traffic from Eastbound Route 625 to Southbound
Route 28 open to traffic in the background.
|