| November 2007 Progress Photos at the Nokes Boulevard Interchange
|
Delivery of 66" concrete pipe.
|
Installation of temporary traffic signal.
|
Asphalt paving SB Rt. 28.
|
Installation of 66" concrete pipe.
|
Drilling for bridge piles. 28.
|
Installation of underdrain.
|
Installation of bridge piles. 28.
|
©
Copyright 2002 Route 28 Corridor Improvements, LLC. All Rights Reserved.
|
|